ML
ML Systems.info
T4Human-essentialPhase 7 of 13

Radon Mitigation System

Mechanical Rough-In

Description

Install sub-slab depressurization system — perforated PVC below slab, sealed penetration through roof, and fan location for future activation. RI requires radon-resistant new construction per state building code. Passive system convertible to active.

Tools (ML1 Confirmed)

  • pvc cutter
  • drill
  • sealant gun
  • tape measure
  • hand tools

Atomic Primitives

cutjoinsealroute

1-2

Crew Size

4-6h

Estimated Hours

7

Phase

T4

Robot Tier

Other Tasks in Phase 7: Mechanical Rough-In

Related Resources

radon mitigation systemsub-slab depressurizationradon pipe installationRI radon code