T4 — Human-essentialPhase 7 of 13
Radon Mitigation System
Mechanical Rough-In
Description
Install sub-slab depressurization system — perforated PVC below slab, sealed penetration through roof, and fan location for future activation. RI requires radon-resistant new construction per state building code. Passive system convertible to active.
Tools (ML1 Confirmed)
- pvc cutter
- drill
- sealant gun
- tape measure
- hand tools
Atomic Primitives
cutjoinsealroute
1-2
Crew Size
4-6h
Estimated Hours
7
Phase
T4
Robot Tier
Other Tasks in Phase 7: Mechanical Rough-In