T4 — Human-essentialPhase 7 of 13
Gas Line Rough-In
Mechanical Rough-In
Description
Install gas piping (black iron or CSST) for furnace, water heater, range, and dryer. Sizing per BTU load and pipe length. Pressure test at 15 PSI for 15 minutes minimum. Gas work requires licensed plumber or gasfitter in RI.
Tools (ML1 Confirmed)
- pipe wrench
- pipe threader
- pressure gauge
- leak detector
- hand tools
Atomic Primitives
cutthreadjointest
1-2
Crew Size
4-8h
Estimated Hours
7
Phase
T4
Robot Tier
Other Tasks in Phase 7: Mechanical Rough-In
Related Resources
gas line installationCSST gas pipingresidential gas rough ingas pressure test