T4 — Human-essentialPhase 7 of 13
HVAC Rough-In
Mechanical Rough-In
Description
Install ductwork, refrigerant lines, and condensate drains per mechanical plan. Trunk-and-branch or high-velocity system layout. Duct sealing with mastic (not tape) at all joints. Manual J load calc drives equipment sizing.
Tools (ML1 Confirmed)
- tin snips
- crimper
- mastic gun
- drill
- tape measure
Atomic Primitives
cutjoinsealroute
2-4
Crew Size
12-20h
Estimated Hours
7
Phase
T4
Robot Tier
Other Tasks in Phase 7: Mechanical Rough-In
Related Resources
HVAC rough inductwork installationresidential HVAC ductmechanical rough in