Plumbing Rough-In

Mechanical Rough-In

Description

Install drain-waste-vent (DWV) piping, water supply lines, and stub-outs for all fixtures per plumbing plan. DWV first — it is rigid and gravity-dependent. Supply lines flex around DWV. Pressure test before closing walls.

Tools (ML1 Confirmed)

  • pipe cutter
  • soldering torch
  • pipe wrench
  • level
  • drill

Atomic Primitives

cutjoinroutetest

2-3

Crew Size

16-24h

Estimated Hours

7

Phase

T4

Robot Tier

Other Tasks in Phase 7: Mechanical Rough-In

Related Resources

plumbing rough inDWV piping installationresidential plumbing roughwater supply rough in