T4 — Human-essentialPhase 7 of 13
Electrical Rough-In
Mechanical Rough-In
Description
Run Romex (NM-B) cable for all circuits, install boxes for outlets, switches, and fixtures per electrical plan. AFCI protection required on all living spaces, GFCI on wet areas and exterior. Panel schedule drives circuit sizing and breaker allocation.
Tools (ML1 Confirmed)
- wire strippers
- drill
- fish tape
- stud finder
- hand tools
Atomic Primitives
routestripconnectsecure
2-3
Crew Size
16-24h
Estimated Hours
7
Phase
T4
Robot Tier
Other Tasks in Phase 7: Mechanical Rough-In
Related Resources
electrical rough inRomex wiring residentialelectrical box installationcircuit wiring construction