ML
ML Systems.info
T4Human-essentialPhase 7 of 13

Fire Blocking & Draft Stopping

Mechanical Rough-In

Description

Install fire blocking at floor/ceiling intersections, soffits, dropped ceilings, and around penetrations. Required by IRC R302.11 to prevent fire and smoke spread through concealed spaces. Often overlooked — critical code compliance item.

Tools (ML1 Confirmed)

  • circular saw
  • caulk gun
  • fire rated foam
  • hand tools

Atomic Primitives

cutsealfillverify

2-3

Crew Size

4-6h

Estimated Hours

7

Phase

T4

Robot Tier

Other Tasks in Phase 7: Mechanical Rough-In

Related Resources

fire blocking residentialdraft stopping constructionIRC fire blockingconcealed space fire stop