T1 — Near-term automationPhase 6 of 13
Window Rough Opening Flashing
Sheathing & WRB
Description
Flash window rough openings with self-adhered membrane — sill pan first, then jambs, then head. Proper sequencing is critical: water must always be able to drain out, never in. Most water intrusion failures trace back to flashing errors.
Tools (ML1 Confirmed)
- utility knife
- roller
- tape measure
- flashing membrane
- hand tools
Atomic Primitives
cutapplypressverify
2-3
Crew Size
3-5h
Estimated Hours
6
Phase
T1
Robot Tier
Other Tasks in Phase 6: Sheathing & WRB
Related Resources
window flashing installationrough opening flashingsill pan flashingwindow waterproofing