Exterior Wall Sheathing

Sheathing & WRB

Description

Install continuous exterior sheathing — ZIP system, OSB with WRB, or plywood with housewrap. ZIP system combines sheathing and WRB in one layer. Panel layout planned to minimize waste and maximize air barrier continuity.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • tape measure
  • chalk line
  • hand tools

Atomic Primitives

positionfastencutseal

3-4

Crew Size

6-10h

Estimated Hours

6

Phase

T1

Robot Tier