ML
ML Systems.info
T1Near-term automationPhase 4 of 13

Structural Wall Sheathing

Framing — Walls

Description

Install 7/16-inch or 1/2-inch OSB structural sheathing on exterior walls for lateral bracing. Nailing schedule per shear wall design — typically 3-inch nails at 4 inches on center at edges for high-shear panels. Stagger vertical joints.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • chalk line
  • tape measure
  • hand tools

Atomic Primitives

positionfastencutverify

3-4

Crew Size

6-10h

Estimated Hours

4

Phase

T1

Robot Tier

Other Tasks in Phase 4: Framing — Walls

Related Resources

structural sheathing wallsOSB wall sheathingshear wall nailingwall bracing sheathing