ML
ML Systems.info
T1Near-term automationPhase 4 of 13

Top Plate & Double Top Plate

Framing — Walls

Description

Install single top plate during wall assembly, then add double top plate after walls are raised and plumbed. Double top plate laps at corners and intersections by minimum 48 inches. This is what ties the building together as a structural unit.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • tape measure
  • level
  • hand tools

Atomic Primitives

cutfastenlapverify

2-4

Crew Size

3-6h

Estimated Hours

4

Phase

T1

Robot Tier

Other Tasks in Phase 4: Framing — Walls

Related Resources

double top platetop plate framingwall plate lappingdouble plate corners