T1 — Near-term automationPhase 4 of 13
Top Plate & Double Top Plate
Framing — Walls
Description
Install single top plate during wall assembly, then add double top plate after walls are raised and plumbed. Double top plate laps at corners and intersections by minimum 48 inches. This is what ties the building together as a structural unit.
Tools (ML1 Confirmed)
- framing nailer
- circular saw
- tape measure
- level
- hand tools
Atomic Primitives
cutfastenlapverify
2-4
Crew Size
3-6h
Estimated Hours
4
Phase
T1
Robot Tier
Other Tasks in Phase 4: Framing — Walls
Related Resources
double top platetop plate framingwall plate lappingdouble plate corners