ML
ML Systems.info
T1Near-term automationPhase 4 of 13

Stud Framing & Assembly

Framing — Walls

Description

Cut studs to height and nail between top and bottom plates. 16 inches on center for bearing walls, 24 inches for non-bearing per energy code allowance. Crown all studs — bow facing same direction. Pre-assembled walls tilted up into position.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • tape measure
  • level
  • hand tools

Atomic Primitives

cutpositionfastenplumb

3-5

Crew Size

8-16h

Estimated Hours

4

Phase

T1

Robot Tier

Other Tasks in Phase 4: Framing — Walls

Related Resources

wall stud framingresidential stud walls16 on center framingwall framing assembly