T1 — Near-term automationPhase 4 of 13
Stud Framing & Assembly
Framing — Walls
Description
Cut studs to height and nail between top and bottom plates. 16 inches on center for bearing walls, 24 inches for non-bearing per energy code allowance. Crown all studs — bow facing same direction. Pre-assembled walls tilted up into position.
Tools (ML1 Confirmed)
- framing nailer
- circular saw
- tape measure
- level
- hand tools
Atomic Primitives
cutpositionfastenplumb
3-5
Crew Size
8-16h
Estimated Hours
4
Phase
T1
Robot Tier
Other Tasks in Phase 4: Framing — Walls
Related Resources
wall stud framingresidential stud walls16 on center framingwall framing assembly