T1 — Near-term automationPhase 4 of 13
Header & Rough Opening Assembly
Framing — Walls
Description
Build and install headers over window and door openings using doubled 2x lumber, LVL, or engineered beams per span tables. King studs, trimmers (jacks), and cripples complete the rough opening. Size verified against window/door schedule.
Tools (ML1 Confirmed)
- framing nailer
- circular saw
- tape measure
- level
- hand tools
Atomic Primitives
cutassemblefastenverify
2-4
Crew Size
4-8h
Estimated Hours
4
Phase
T1
Robot Tier
Other Tasks in Phase 4: Framing — Walls
Related Resources
window header framingdoor header constructionLVL header installationrough opening framing