ML
ML Systems.info
T2Medium-term automationPhase 3 of 13

Subfloor Sheathing

Framing — Floor

Description

Install 3/4-inch tongue-and-groove OSB or plywood subfloor, glued and screwed to joists. Stagger joints, leave 1/8-inch expansion gap at walls. Construction adhesive plus screws at 6 inches on center at edges eliminates floor squeaks.

Tools (ML1 Confirmed)

  • screw gun
  • circular saw
  • adhesive gun
  • tape measure
  • chalk line

Atomic Primitives

gluepositionfastencut

2-4

Crew Size

4-8h

Estimated Hours

3

Phase

T2

Robot Tier

Other Tasks in Phase 3: Framing — Floor

Related Resources

subfloor installationOSB subfloortongue and groove subfloorsubfloor glue and screw