T2 — Medium-term automationPhase 3 of 13
Subfloor Sheathing
Framing — Floor
Description
Install 3/4-inch tongue-and-groove OSB or plywood subfloor, glued and screwed to joists. Stagger joints, leave 1/8-inch expansion gap at walls. Construction adhesive plus screws at 6 inches on center at edges eliminates floor squeaks.
Tools (ML1 Confirmed)
- screw gun
- circular saw
- adhesive gun
- tape measure
- chalk line
Atomic Primitives
gluepositionfastencut
2-4
Crew Size
4-8h
Estimated Hours
3
Phase
T2
Robot Tier
Other Tasks in Phase 3: Framing — Floor
Related Resources
subfloor installationOSB subfloortongue and groove subfloorsubfloor glue and screw