T2 — Medium-term automationPhase 3 of 13
Sill Plate Installation
Framing — Floor
Description
Install pressure-treated sill plate over sill seal gasket, drilling for anchor bolts. Check foundation walls for level and shim as needed. Sill plate is the critical transition from concrete to wood — must be dead level.
Tools (ML1 Confirmed)
- hammer drill
- impact driver
- level
- circular saw
- hand tools
Atomic Primitives
drillfastenlevelshim
2-3
Crew Size
4-6h
Estimated Hours
3
Phase
T2
Robot Tier
Other Tasks in Phase 3: Framing — Floor
Related Resources
sill plate installationpressure treated sill platefoundation sill plateanchor bolt sill plate