ML
ML Systems.info
T2Medium-term automationPhase 3 of 13

Rim Board / Band Joist

Framing — Floor

Description

Install rim board (typically 1-1/8 inch LVL or 2x material) on top of sill plate around the perimeter. Rim board transfers floor loads to foundation and provides a nailing surface for exterior sheathing. Seal top and bottom edges for air tightness.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • tape measure
  • level
  • hand tools

Atomic Primitives

cutfastenalignseal

2-3

Crew Size

2-4h

Estimated Hours

3

Phase

T2

Robot Tier

Other Tasks in Phase 3: Framing — Floor

Related Resources

rim board installationband joist framingfloor framing perimeterLVL rim board