T2 — Medium-term automationPhase 3 of 13
Rim Board / Band Joist
Framing — Floor
Description
Install rim board (typically 1-1/8 inch LVL or 2x material) on top of sill plate around the perimeter. Rim board transfers floor loads to foundation and provides a nailing surface for exterior sheathing. Seal top and bottom edges for air tightness.
Tools (ML1 Confirmed)
- framing nailer
- circular saw
- tape measure
- level
- hand tools
Atomic Primitives
cutfastenalignseal
2-3
Crew Size
2-4h
Estimated Hours
3
Phase
T2
Robot Tier
Other Tasks in Phase 3: Framing — Floor
Related Resources
rim board installationband joist framingfloor framing perimeterLVL rim board