ML
ML Systems.info
T2Medium-term automationPhase 3 of 13

Floor Joist Layout & Install

Framing — Floor

Description

Layout and install floor joists at 16 or 12 inches on center per structural plans. Engineered I-joists, TJI, or dimensional lumber depending on span. Web stiffeners at bearing points, blocking at midspan for joists over 12 feet.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • tape measure
  • joist hanger nailer
  • hand tools

Atomic Primitives

measurecutpositionfasten

3-4

Crew Size

6-10h

Estimated Hours

3

Phase

T2

Robot Tier

Other Tasks in Phase 3: Framing — Floor

Related Resources

floor joist installationTJI joist layoutengineered floor joistsjoist hanger installation