T2 — Medium-term automationPhase 3 of 13
Floor Joist Layout & Install
Framing — Floor
Description
Layout and install floor joists at 16 or 12 inches on center per structural plans. Engineered I-joists, TJI, or dimensional lumber depending on span. Web stiffeners at bearing points, blocking at midspan for joists over 12 feet.
Tools (ML1 Confirmed)
- framing nailer
- circular saw
- tape measure
- joist hanger nailer
- hand tools
Atomic Primitives
measurecutpositionfasten
3-4
Crew Size
6-10h
Estimated Hours
3
Phase
T2
Robot Tier
Other Tasks in Phase 3: Framing — Floor
Related Resources
floor joist installationTJI joist layoutengineered floor joistsjoist hanger installation