Slab-on-Grade Preparation
Foundation
Description
Prepare sub-base for concrete slab — compacted gravel, vapor barrier (10-mil poly minimum), rigid insulation at perimeter per energy code, and welded wire reinforcement or rebar mat. Radon mitigation piping roughed in below slab in RI.
Tools (ML1 Confirmed)
- compaction tester
- laser level
- rebar cutter
- hand tools
- skid steer
Atomic Primitives
compactlaypositionconnect
3-4
Crew Size
6-10h
Estimated Hours
2
Phase
T3
Robot Tier