Slab-on-Grade Preparation

Foundation

Description

Prepare sub-base for concrete slab — compacted gravel, vapor barrier (10-mil poly minimum), rigid insulation at perimeter per energy code, and welded wire reinforcement or rebar mat. Radon mitigation piping roughed in below slab in RI.

Tools (ML1 Confirmed)

  • compaction tester
  • laser level
  • rebar cutter
  • hand tools
  • skid steer

Atomic Primitives

compactlaypositionconnect

3-4

Crew Size

6-10h

Estimated Hours

2

Phase

T3

Robot Tier