Foundation Wall Construction

Foundation

Description

Form, reinforce, and pour foundation walls — typically 8-inch or 10-inch poured concrete. Horizontal and vertical rebar per structural schedule. Window and door bucks placed before pour. Snap ties removed and patched after strip.

Tools (ML1 Confirmed)

  • wall forms
  • rebar cutter
  • concrete vibrator
  • snap tie breaker
  • transit level

Atomic Primitives

formreinforcepourstrip

4-6

Crew Size

12-24h

Estimated Hours

2

Phase

T3

Robot Tier

Other Tasks in Phase 2: Foundation

Related Resources

poured concrete foundationfoundation wall formingresidential foundation wallsconcrete wall construction