T3 — Long-term automationPhase 2 of 13
Foundation Wall Construction
Foundation
Description
Form, reinforce, and pour foundation walls — typically 8-inch or 10-inch poured concrete. Horizontal and vertical rebar per structural schedule. Window and door bucks placed before pour. Snap ties removed and patched after strip.
Tools (ML1 Confirmed)
- wall forms
- rebar cutter
- concrete vibrator
- snap tie breaker
- transit level
Atomic Primitives
formreinforcepourstrip
4-6
Crew Size
12-24h
Estimated Hours
2
Phase
T3
Robot Tier
Other Tasks in Phase 2: Foundation
Related Resources
poured concrete foundationfoundation wall formingresidential foundation wallsconcrete wall construction