Foundation Excavation

Foundation

Description

Excavate to bearing depth per structural plans, typically 48 inches below grade in Rhode Island for frost protection. Soil conditions documented and compared to geotechnical report. Over-excavation backfilled with compacted gravel.

Tools (ML1 Confirmed)

  • excavator
  • transit level
  • laser level
  • compaction tester
  • hand tools

Atomic Primitives

excavatemeasureverifycompact

2-4

Crew Size

8-16h

Estimated Hours

2

Phase

T3

Robot Tier

Other Tasks in Phase 2: Foundation

Related Resources

foundation excavationresidential excavation depthfrost line excavation RIfoundation dig