ML
ML Systems.info
T3Long-term automationPhase 2 of 13

Anchor Bolt & Hold-Down Install

Foundation

Description

Set anchor bolts and hold-down straps in wet concrete per structural plans. Typical spacing: 1/2-inch J-bolts at 6 feet on center with bolts within 12 inches of corners. Simpson HDU hold-downs at shear wall locations.

Tools (ML1 Confirmed)

  • layout tools
  • anchor bolt template
  • hand tools
  • transit level

Atomic Primitives

positionembedverifymark

2-3

Crew Size

2-4h

Estimated Hours

2

Phase

T3

Robot Tier

Other Tasks in Phase 2: Foundation

Related Resources

anchor bolt installationfoundation anchor boltshold-down hardwareSimpson hold-down installation