Roof Sheathing

Framing — Roof

Description

Install 1/2-inch or 5/8-inch OSB or plywood roof sheathing with H-clips at unsupported edges. 8d nails at 6 inches on center at edges, 12 inches in field. Stagger joints. In high-wind zones, enhanced nailing schedule per structural.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • chalk line
  • tape measure
  • hand tools

Atomic Primitives

positionfastencutverify

3-4

Crew Size

6-10h

Estimated Hours

5

Phase

T2

Robot Tier