ML
ML Systems.info
T2Medium-term automationPhase 5 of 13

Rafter Cut & Install

Framing — Roof

Description

Cut and install common, hip, valley, and jack rafters per roof plan. Plumb cut at ridge, birdsmouth at plate, tail cut for overhang. Rafter tables or construction calculator for angles. 16 or 24 inches on center per structural.

Tools (ML1 Confirmed)

  • circular saw
  • framing nailer
  • speed square
  • tape measure
  • hand tools

Atomic Primitives

calculatecutpositionfasten

3-5

Crew Size

8-16h

Estimated Hours

5

Phase

T2

Robot Tier

Other Tasks in Phase 5: Framing — Roof

Related Resources

rafter cutting installationbirdsmouth cut rafterroof rafter framinghip valley rafter