Drip Edge & Ice/Water Shield

Framing — Roof

Description

Install metal drip edge at eaves (under underlayment) and rakes (over underlayment). Apply ice and water shield membrane at eaves — minimum 24 inches past interior wall line per IRC in cold climates. This is the first line of defense.

Tools (ML1 Confirmed)

  • tin snips
  • roofing nailer
  • tape measure
  • utility knife
  • hand tools

Atomic Primitives

cutpositionfastenseal

2-3

Crew Size

3-5h

Estimated Hours

5

Phase

T2

Robot Tier

Other Tasks in Phase 5: Framing — Roof

Related Resources

drip edge installationice and water shieldroof edge flashingeave protection membrane