ML
ML Systems.info
T2Medium-term automationPhase 5 of 13

Collar Ties & Rafter Ties

Framing — Roof

Description

Install collar ties in upper third of rafter span to prevent ridge separation, and rafter ties at plate level to resist thrust. Required on every other rafter pair minimum. Alternative: structural ridge beam eliminates need for ties.

Tools (ML1 Confirmed)

  • framing nailer
  • circular saw
  • tape measure
  • hand tools

Atomic Primitives

cutpositionfastenverify

2-3

Crew Size

3-5h

Estimated Hours

5

Phase

T2

Robot Tier

Other Tasks in Phase 5: Framing — Roof

Related Resources

collar tie installationrafter tie framingroof tie constructioncollar tie spacing