T2 — Medium-term automationPhase 1 of 13
Temporary Utilities Setup
Site Preparation
Description
Establish temporary electrical service (200A panel typical), water connection, and portable sanitation. Coordinate with National Grid and municipal water authority. Temporary power must be GFCI-protected per OSHA.
Tools (ML1 Confirmed)
- wire strippers
- multimeter
- conduit bender
- trencher
- hand tools
Atomic Primitives
connectrouteverifysecure
2-3
Crew Size
4-8h
Estimated Hours
1
Phase
T2
Robot Tier
Other Tasks in Phase 1: Site Preparation
Related Resources
temporary construction powerjob site utilitiesconstruction electrical setuptemporary water construction