Erosion & Sediment Control

Site Preparation

Description

Install silt fence, straw wattles, and construction entrance stabilization per RIPDES stormwater requirements. Required before any ground disturbance on sites over 1 acre or within 200 feet of wetlands.

Tools (ML1 Confirmed)

  • post driver
  • staple gun
  • trencher
  • hand tools
  • level

Atomic Primitives

trenchfastenpositioninspect

2-3

Crew Size

4-6h

Estimated Hours

1

Phase

T2

Robot Tier

Other Tasks in Phase 1: Site Preparation

Related Resources

erosion control constructionsilt fence installationRIPDES compliancesediment control residential