T2 — Medium-term automationPhase 1 of 13
Erosion & Sediment Control
Site Preparation
Description
Install silt fence, straw wattles, and construction entrance stabilization per RIPDES stormwater requirements. Required before any ground disturbance on sites over 1 acre or within 200 feet of wetlands.
Tools (ML1 Confirmed)
- post driver
- staple gun
- trencher
- hand tools
- level
Atomic Primitives
trenchfastenpositioninspect
2-3
Crew Size
4-6h
Estimated Hours
1
Phase
T2
Robot Tier
Other Tasks in Phase 1: Site Preparation
Related Resources
erosion control constructionsilt fence installationRIPDES compliancesediment control residential