T2 — Medium-term automationPhase 1 of 13
Rough Grading & Earthwork
Site Preparation
Description
Cut and fill soil to achieve design elevations with proper drainage slopes away from the building footprint. Minimum 6-inch drop over the first 10 feet per IRC. Compaction testing follows in lifts for engineered fill areas.
Tools (ML1 Confirmed)
- excavator
- skid steer
- transit level
- compaction tester
- rake
Atomic Primitives
cutfillgradecompact
2-4
Crew Size
8-16h
Estimated Hours
1
Phase
T2
Robot Tier
Other Tasks in Phase 1: Site Preparation
Related Resources
rough grading residentialsite earthworkconstruction gradingdrainage slope grading