Rough Grading & Earthwork

Site Preparation

Description

Cut and fill soil to achieve design elevations with proper drainage slopes away from the building footprint. Minimum 6-inch drop over the first 10 feet per IRC. Compaction testing follows in lifts for engineered fill areas.

Tools (ML1 Confirmed)

  • excavator
  • skid steer
  • transit level
  • compaction tester
  • rake

Atomic Primitives

cutfillgradecompact

2-4

Crew Size

8-16h

Estimated Hours

1

Phase

T2

Robot Tier

Other Tasks in Phase 1: Site Preparation

Related Resources

rough grading residentialsite earthworkconstruction gradingdrainage slope grading