T1 — Near-term automationPhase 8 of 13
Vapor Barrier & Air Sealing
Insulation & Drywall
Description
Install vapor retarder (kraft-faced batts or poly sheet) on warm side of insulation in RI climate zone 5. Seal all penetrations — electrical boxes, plumbing, and wiring — with acoustical sealant or foam. Tight house = efficient house.
Tools (ML1 Confirmed)
- staple gun
- caulk gun
- utility knife
- foam gun
- tape measure
Atomic Primitives
staplesealcutverify
2-3
Crew Size
4-6h
Estimated Hours
8
Phase
T1
Robot Tier
Other Tasks in Phase 8: Insulation & Drywall
Related Resources
vapor barrier installationair sealing constructionvapor retarder residentialclimate zone 5 vapor barrier