ML
ML Systems.info
T1Near-term automationPhase 8 of 13

Vapor Barrier & Air Sealing

Insulation & Drywall

Description

Install vapor retarder (kraft-faced batts or poly sheet) on warm side of insulation in RI climate zone 5. Seal all penetrations — electrical boxes, plumbing, and wiring — with acoustical sealant or foam. Tight house = efficient house.

Tools (ML1 Confirmed)

  • staple gun
  • caulk gun
  • utility knife
  • foam gun
  • tape measure

Atomic Primitives

staplesealcutverify

2-3

Crew Size

4-6h

Estimated Hours

8

Phase

T1

Robot Tier

Other Tasks in Phase 8: Insulation & Drywall

Related Resources

vapor barrier installationair sealing constructionvapor retarder residentialclimate zone 5 vapor barrier