T1 — Near-term automationPhase 8 of 13
Drywall Hanging
Insulation & Drywall
Description
Hang 1/2-inch drywall on ceilings first, then walls. Ceilings perpendicular to joists, walls horizontal with factory edge at ceiling joint. Screws at 12 inches in field, 8 inches at edges. 5/8-inch Type X on garage walls/ceilings for fire rating.
Tools (ML1 Confirmed)
- screw gun
- drywall lift
- T square
- utility knife
- hand tools
Atomic Primitives
liftpositionfastencut
2-4
Crew Size
8-16h
Estimated Hours
8
Phase
T1
Robot Tier
Other Tasks in Phase 8: Insulation & Drywall
Related Resources
drywall hanging installationsheetrock installationdrywall screw patternfire rated drywall