T3 — Long-term automationPhase 12 of 13
Plumbing Fixture Installation
Fixtures & Hardware
Description
Install all plumbing fixtures — toilets, sinks, faucets, showerheads, and bathtubs. Connect to rough-in stub-outs, test for leaks. Set toilets with wax ring on flange, hand-tighten bolts. Shut-off valves accessible for every fixture.
Tools (ML1 Confirmed)
- basin wrench
- pipe wrench
- level
- caulk gun
- hand tools
Atomic Primitives
connectsealtestadjust
1-2
Crew Size
6-10h
Estimated Hours
12
Phase
T3
Robot Tier
Other Tasks in Phase 12: Fixtures & Hardware
Related Resources
plumbing fixture installationtoilet installationfaucet installationsink installation residential