ML
ML Systems.info
T3Long-term automationPhase 12 of 13

Plumbing Fixture Installation

Fixtures & Hardware

Description

Install all plumbing fixtures — toilets, sinks, faucets, showerheads, and bathtubs. Connect to rough-in stub-outs, test for leaks. Set toilets with wax ring on flange, hand-tighten bolts. Shut-off valves accessible for every fixture.

Tools (ML1 Confirmed)

  • basin wrench
  • pipe wrench
  • level
  • caulk gun
  • hand tools

Atomic Primitives

connectsealtestadjust

1-2

Crew Size

6-10h

Estimated Hours

12

Phase

T3

Robot Tier

Other Tasks in Phase 12: Fixtures & Hardware

Related Resources

plumbing fixture installationtoilet installationfaucet installationsink installation residential