T3 — Long-term automationPhase 12 of 13
Appliance Setting & Connection
Fixtures & Hardware
Description
Set and connect all appliances — range, refrigerator, dishwasher, washer, dryer, range hood, and garbage disposal. Gas connections by licensed plumber. Water lines for refrigerator ice maker and dishwasher. Level all appliances, verify operation.
Tools (ML1 Confirmed)
- level
- pipe wrench
- screwdriver set
- multimeter
- hand tools
Atomic Primitives
positionconnectleveltest
2-3
Crew Size
4-6h
Estimated Hours
12
Phase
T3
Robot Tier
Other Tasks in Phase 12: Fixtures & Hardware
Related Resources
appliance installationdishwasher installationrange connectionwasher dryer hookup