ML
ML Systems.info
T3Long-term automationPhase 12 of 13

Appliance Setting & Connection

Fixtures & Hardware

Description

Set and connect all appliances — range, refrigerator, dishwasher, washer, dryer, range hood, and garbage disposal. Gas connections by licensed plumber. Water lines for refrigerator ice maker and dishwasher. Level all appliances, verify operation.

Tools (ML1 Confirmed)

  • level
  • pipe wrench
  • screwdriver set
  • multimeter
  • hand tools

Atomic Primitives

positionconnectleveltest

2-3

Crew Size

4-6h

Estimated Hours

12

Phase

T3

Robot Tier

Other Tasks in Phase 12: Fixtures & Hardware

Related Resources

appliance installationdishwasher installationrange connectionwasher dryer hookup