T2 — Medium-term automationPhase 9 of 13
Masonry Veneer & Stone
Exterior Finishes
Description
Install brick, stone, or manufactured stone veneer over WRB with air gap and weep holes. Metal lath and scratch coat for adhered veneer. Full-depth veneer requires foundation shelf. Veneer is non-structural — it is the outermost rain screen layer.
Tools (ML1 Confirmed)
- trowel
- mortar mixer
- wet saw
- level
- hand tools
Atomic Primitives
mixapplysetpoint
2-4
Crew Size
12-24h
Estimated Hours
9
Phase
T2
Robot Tier
Other Tasks in Phase 9: Exterior Finishes
Related Resources
stone veneer installationbrick veneer residentialmanufactured stone veneermasonry veneer construction