T2 — Medium-term automationPhase 9 of 13
Exterior Door Installation
Exterior Finishes
Description
Install pre-hung exterior doors — entry, garage service, and sliders. Shim at hinges and strike, verify operation before final fastening. Threshold must integrate with pan flashing. Weatherstrip compression test with dollar bill.
Tools (ML1 Confirmed)
- level
- shims
- screw gun
- drill
- hand tools
Atomic Primitives
positionshimfastenadjust
2-3
Crew Size
3-6h
Estimated Hours
9
Phase
T2
Robot Tier
Other Tasks in Phase 9: Exterior Finishes
Related Resources
exterior door installationpre-hung door installdoor threshold flashingentry door installation