ML
ML Systems.info
T2Medium-term automationPhase 9 of 13

Exterior Door Installation

Exterior Finishes

Description

Install pre-hung exterior doors — entry, garage service, and sliders. Shim at hinges and strike, verify operation before final fastening. Threshold must integrate with pan flashing. Weatherstrip compression test with dollar bill.

Tools (ML1 Confirmed)

  • level
  • shims
  • screw gun
  • drill
  • hand tools

Atomic Primitives

positionshimfastenadjust

2-3

Crew Size

3-6h

Estimated Hours

9

Phase

T2

Robot Tier

Other Tasks in Phase 9: Exterior Finishes

Related Resources

exterior door installationpre-hung door installdoor threshold flashingentry door installation