ML
ML Systems.info
T3Long-term automationPhase 10 of 13

Hardwood Floor Installation

Interior Finishes

Description

Install solid or engineered hardwood flooring — nail-down on plywood, glue-down on concrete, or floating for engineered. Acclimate material 72 hours minimum. Stagger joints, maintain expansion gaps at walls. Sand and finish on site or pre-finished.

Tools (ML1 Confirmed)

  • floor nailer
  • miter saw
  • tape measure
  • pry bar
  • hand tools

Atomic Primitives

acclimatepositionfastensand

2-3

Crew Size

8-16h

Estimated Hours

10

Phase

T3

Robot Tier

Other Tasks in Phase 10: Interior Finishes

Related Resources

hardwood floor installationengineered hardwood installfloor nailer hardwoodhardwood acclimation