T3 — Long-term automationPhase 10 of 13
Hardwood Floor Installation
Interior Finishes
Description
Install solid or engineered hardwood flooring — nail-down on plywood, glue-down on concrete, or floating for engineered. Acclimate material 72 hours minimum. Stagger joints, maintain expansion gaps at walls. Sand and finish on site or pre-finished.
Tools (ML1 Confirmed)
- floor nailer
- miter saw
- tape measure
- pry bar
- hand tools
Atomic Primitives
acclimatepositionfastensand
2-3
Crew Size
8-16h
Estimated Hours
10
Phase
T3
Robot Tier
Other Tasks in Phase 10: Interior Finishes
Related Resources
hardwood floor installationengineered hardwood installfloor nailer hardwoodhardwood acclimation