ML
ML Systems.info
T3Long-term automationPhase 10 of 13

Cabinet Installation

Interior Finishes

Description

Install upper cabinets first (held by ledger board), then base cabinets. Level, plumb, and shim — kitchens are unforgiving of out-of-level. Screw through cabinet backs into studs. Fillers at walls, end panels where exposed.

Tools (ML1 Confirmed)

  • level
  • screw gun
  • clamps
  • shims
  • hand tools

Atomic Primitives

levelpositionfastenshim

2-3

Crew Size

8-12h

Estimated Hours

10

Phase

T3

Robot Tier

Other Tasks in Phase 10: Interior Finishes

Related Resources

kitchen cabinet installationcabinet shimming levelingupper cabinet installcabinet filler strips