T3 — Long-term automationPhase 10 of 13
Cabinet Installation
Interior Finishes
Description
Install upper cabinets first (held by ledger board), then base cabinets. Level, plumb, and shim — kitchens are unforgiving of out-of-level. Screw through cabinet backs into studs. Fillers at walls, end panels where exposed.
Tools (ML1 Confirmed)
- level
- screw gun
- clamps
- shims
- hand tools
Atomic Primitives
levelpositionfastenshim
2-3
Crew Size
8-12h
Estimated Hours
10
Phase
T3
Robot Tier
Other Tasks in Phase 10: Interior Finishes
Related Resources
kitchen cabinet installationcabinet shimming levelingupper cabinet installcabinet filler strips