ML
ML Systems.info
T3Long-term automationPhase 11 of 13

Window Casing & Sill/Apron

Trim & Millwork

Description

Install window casing, stool (sill), and apron at all windows. Stool extends 3/4 inch past casing on each side. Apron matches casing profile. Picture-frame style (no stool) is an alternative for contemporary designs.

Tools (ML1 Confirmed)

  • miter saw
  • finish nailer
  • tape measure
  • level
  • hand tools

Atomic Primitives

measurecutpositionfasten

2-3

Crew Size

4-8h

Estimated Hours

11

Phase

T3

Robot Tier

Other Tasks in Phase 11: Trim & Millwork

Related Resources

window casing installationwindow stool apronwindow trim moldingpicture frame window trim